Chevron Philippines Inc.

2020 Project

Total Plant Maintenance (Five Terminals)

March 2020 - Up to Present

Tank Repairs

Installation and Dismantling (Scaffold Rental)

Equipment Rentals


2019 Project

Terminal Automation System Phase I (Special Project)

UXO Detection and Retrieval

Tank 73 Cleaning and Blasting

Tank 3 Cleaning

Modification and Replacement of EFR Tank Seal of Tank 74

Golf Course Rehabilitation

Demolition of Old Oil Wharf Field Office

Repair of Fenders

Repair of Catwalk underdeck of Berth 5 and 6

Rerouting and Crane Use

Repair at Oil Wharf

Fabrication of 60 trash bins for BT/BTF and Banaba Housing Compund


2018 Project

Improvement of Manifold Drainage at Chevron Bats

Demolition/Disposal of Waste Phase 2

Supply of Manpower, tools and equipment for the erection of scaffold for Air Winch Repair

Supply of Manpower and Materials needed for the repair and repaint of RCMAs Oil Wharf berth 5

Supply of Manpower, Tools and equipment for the repair of catwalk underdeck of berth 2 & 3

Erection of scaffold at Slop tanks and De Ballast water tanks at Oil Wharf Berth 5A/5/6.

Convan Power Supply at Batangas Terminal

Supply of Manpower, Tools and equipment for the Fabrication and Modification of OWS Ladder

Oil Wharf Pipeline Painting Project for Berth 5A